What is meant by hydration of cement??
Answers were Sorted based on User's Feedback
Answer / gurunath khavanekar
hydration of cement is chemical process between cement
particles and water which process start when water is add
in cement which produce certain amount of heat (during
setting of cement) and cause shrinkage of cement.
for to avoid this hydration of cement curing is very much
important.
| Is This Answer Correct ? | 56 Yes | 9 No |
Answer / prashant pawar
When water is added to cement then the reaction takes place between cement and water is called as Hydration of cement.
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / manoj kumar bhola
THE CHEMICAL REACTION TAKES PLACE BETWEEN CEMENT AND WATER IS KNOWN AS HYDRATION OF CEMENT.
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / akram
hydration is the chemical process which produced when water add with cement a reaction is start this reaction called hydration
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / mundhe manoj
When a water is added to cement , a chemical reaction starts which exothermic in nature and produce significant amount of heat is known as hydration of cement
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / manivelan .s
Whenever water add with cement hydration reaction will be accur. It is heat will be produced and solid componet(tri calcium silicate) formed. Minimum water content for hydration 23 percentage
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / veeramani
Cements used for making concrete have the property of reating chemically with water in an exothermic process is called hydration that results in water treatment products.
| Is This Answer Correct ? | 0 Yes | 0 No |
how much steel is required for 1 sqft of slab
how much grade of concrete can be used for different structural element such as slab,beam,column,footing & plinth beams? and type of cement can be used in construction work & also types of cemnt grades
Define What is rigging?
list out various type of codes:-
what is the percentage of silt in black cotton soil.?
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
whats the difference between young's modulus,stress and pressure.they have same unit
What happens to Load at yielding ?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
Rate of plasting per sq.ft...?
how to calculate 1 cubic meter rcc concrete 1:1.5:3 ratio ,how much aggrates and sand , quanitites
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)