Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the difference between the splice & Lap length.

Answers were Sorted based on User's Feedback



what is the difference between the splice & Lap length...

Answer / santosh kumar

splice length means two members are connected by plate.
lap length means two members are over lapped.

Is This Answer Correct ?    21 Yes 1 No

what is the difference between the splice & Lap length...

Answer / shreedhar

Splicing is done only in columns, in which the rod which is
to laped it is slightly bent so that the vertical should
come over below rod.and laping is done in any horizontal
member like slabs and beams.

Is This Answer Correct ?    2 Yes 11 No

Post New Answer

More Civil Engineering Interview Questions

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing for M25 design mix conc.?pl give idea with relavant is code

9 Answers   IP Infra Power,


How to calculate the quantity for masonry(block and plaster)?

2 Answers  


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

0 Answers  


How i calculate Cement sand Quantities in 100 Sq.ft Plaster?

1 Answers   ABC,


How could I calculate quantities of fine aggrigates(sand) & coarse aggregates in pcc M15

1 Answers   Coromandel, RECPDCL,


how much shouid be the rate for ready mix concrete per cubic meter

0 Answers  


concrete mix design for M 30 Grade

1 Answers  


# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not

2 Answers   Brigade,


what is shear key and steel schedule?

2 Answers  


Stringer How many cm goes to landind

0 Answers   ACC,


types of concrete?

8 Answers  


how can u extent the final setting time of cement?

2 Answers   Sobha Developers, TNPSC Tamil Nadu Public Service Commission,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)