what is the dimensions of river sand truck trailer or trolly ?
No Answer is Posted For this Question
Be the First to Post Answer
Quality control
what could be the production cost of 1 cum of concrete by CP30 plant
How to calculate the crank rod in slab
0 Answers Bridge and Roof, Krishna Constructions,
how do you measure the 1:2:4 and 1:1:2 proportion rcc concrete for one cubic metre? what is the cement qty. sand qty. jelly qty.
Which is the IS code Using for Cement Sand Mortar
how to design a formwork for beam, how to determine the load baring capacity of the cuplock system and which is the relevant code for the same.
How calculate the physical stock of material such as Fine/Coarse aggregate,sand & stone dust laying at site?
13. What are your expectations from this possible relocation to our company?
Cement sand mortar ratio 1:6 and 1:3. In canal lining 10mm & 16mm respectively done after 24hrs difference between them . Tell me Torrence limit of above ratio after 1 Year .
What is the slope of vertical wall ? quick ans
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
if L*B*H = 20 then direct no of bricks =20 *500
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)