Ratio of cement : sand for fixing slab and tiles in the
floor and also quantity of cement and sand requires for
laying slab and tiles separately (area 100 sq. ft)
Answer / md. mainul islam
Ratio=1:4
Cement:1.5 Bag
Sand: 7.5 cft
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate cement mortor for wet and dry mix for different ratios
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
how to stop beam concrete between column
What is the name of this multiplication factors ?
0 Answers Engineers India Limited, L&T,
What is all weather canal
Why shoring is employed in building industry?
What is unit weight of 1st class bricks ?
Please let me know what is the simplest way of Calculating Mix Designs
bulkege of concrete for design mix concrete for grade m30
What is costing in 100squre feet bricks
The slenderness ratio of a column is zero when its length ??
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)