Ratio of cement : sand for fixing slab and tiles in the
floor and also quantity of cement and sand requires for
laying slab and tiles separately (area 100 sq. ft)
Answer Posted / md. mainul islam
Ratio=1:4
Cement:1.5 Bag
Sand: 7.5 cft
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
significance of specific surface area of particles?
What is bylayer?
for pretensioning which will yield first and same for post tensioning?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Explain major difference between auto level and dumpy level?
how to conversation of all construction material in to brass
Explain the mechanism of cavitations in pipes and drains?
why we create short columns under grade slab?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
can you give me the details of rate analysis of steel and concrete?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Explain the difference between shear and tensile strength.
afe or not