Water absorption for stone?

Answers were Sorted based on User's Feedback



Water absorption for stone?..

Answer / suresh

for a good stone percentage absorption by weight after 24 hours should not exceed 0.6.

Is This Answer Correct ?    14 Yes 1 No

Water absorption for stone?..

Answer / aditya richie

stone soked in water for 24 hours weighed ,it is then oven
dried for 4 hours and weighed . Difference in weights gives
water absorbed by stone . water absorption is calculated by
dividing water absorbed by dry weight of stone and
multiplying it with hundred .

Is This Answer Correct ?    5 Yes 1 No

Water absorption for stone?..

Answer / guest

5%

Is This Answer Correct ?    9 Yes 6 No

Water absorption for stone?..

Answer / babu

5% of on it's weight

Is This Answer Correct ?    2 Yes 5 No

Water absorption for stone?..

Answer / lavanya

should not absorb water more than 20% of its own weight when soaked for 24 hours

Is This Answer Correct ?    2 Yes 8 No

Water absorption for stone?..

Answer / ramamurthy l

It should be less than 10%

Is This Answer Correct ?    4 Yes 11 No

Post New Answer

More Civil Engineering Interview Questions

Define mirror?

0 Answers  


How can calculate cement quantity in brick work

2 Answers  


How should i calculate Cutting length of haunch bar in a raft including cover?

2 Answers   gdcl,


What is hybrid foundation?

0 Answers  


what is the proportion of stones and concrete inplum concrete??

2 Answers  






Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design

1 Answers   JPMorgan Chase, Sobha Developers, Structwel,


what is the meaning of degreasing of the euipment or line.

1 Answers  


What is bending moment

2 Answers   Skyline Builders,


How find out Rolling margin of steel dia.wise?

3 Answers  


How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

0 Answers  


1. if only 1 slab of a floor get sagged, how could be it repaired? 2. if any footing gives the cube result, after 28 days less than 16 n/mm2 in spite of 20 n/mm2 what are the remedies ?

3 Answers  


What are the tests required to check the Quality of steel?

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)