If a control valve is hunting means means if we are giving
50% to the cv, the cv will open at 51% then slowly slwoly
it will reaches 49% , so what to do for solve this problem.
The cv is double acting and mounted for anti surge
operation, it having 4 nos. volume booster, one sov, one
positioner, etc..?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Instrumentation Interview Questions

PLZ explain to me massflow

4 Answers  


Dear friends, I have a question: We work on a project which has some boilers to provide steam for desalination unit. The boiler area is safe and the only hazard source is the fuel lines of boilers. I want to know according to NFPA standard which type of instrument should be selected on the fuel line: Eex Type or Non-Eex type? Thanks in advance

2 Answers  


What is the reason PT speed not incresed in gas turbine?

0 Answers   ROC,


how to calculate range of level transmitter?

0 Answers   TCE,


wht is dcs architecture ? can u give example?

3 Answers  






The wire is disconnected from the fuel gauge sending unit (bimetallic gauge). A voltmeter connected to the wire reads a pulsating 5v. What does this indicate?

3 Answers  


tell me the field & lab calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter, temperature transmitter, temperature indicator, flow indicator, level indicator, control valve, thermocouple, pressure indicator (digital & analogue),

0 Answers  


loop chech tools list

1 Answers   BAP,


what is different between 2,3&4 wire rtd and how much maximum distance using plc to field.

0 Answers  


In control valve , Failure position : Close If it is Fail close(FC) during failure of AIR.. what will be the initial/ normal position of control valve is it normally open or close? please some one explain soon..

2 Answers  


how to know power plant process with corresbonding laws&thoeries

1 Answers   Bhel,


why we use the 4-20 mamp signal used for transmitter.

5 Answers   Tecnimont,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)