Answer / arun mozhi varman
10m x 10m x 0.025m =2.5cum add 15% allowance ie 2.5 x 0.15 =0.375,(total 2.5 0.375=2.875cum) cement - (1440/6)x2.875=690kgs,sand - 2.875cum
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / rambabu penkey
1;6 PER CU M=1.3 CU M SAND=1.3/6*5=1.08 CUM
1.3/6*1=.216CUM
.216*1440=311.04KGS
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / raheel aamir
Ratio 1:6
Cement =1/7=.143
Dry To wet =1.27*.143=.181
Weight in KG = .181*35.31*40= 256.25KG
Wastage factor @5%= 256.25/.95= 269.74Kg
Sand=6/7=.857*1.27=1.089*35.31=38.437/.9=42.71 Cft (Dry to wet =1.27, Wastage Factor= 10%)
Is This Answer Correct ? | 0 Yes | 1 No |
concrete mix design for M 30 Grade
What is the density of DLC & PQC and how it is differ from normal concrete?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
define the grain size analysis and what is the silt size?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is the ideal temparature for concrete?
how inovative you are?...how do u define innovation?
number of standard bricks need 1 cubic meter
What isthe formula for square
1 Answers Panchayati Raj Department,
at what height brick masonr, block masonry & Concrete wall can construct in a day ?
what is the wait of cement in different concrete mixes from M15 TO M50
How do we test on design and style in a software?