how to calculate quantity of cement and sand for plastering works in CM 1:6 proportion.....plz answer anyone.....and write the formula...
Answer Posted / rambabu penkey
1;6 PER CU M=1.3 CU M SAND=1.3/6*5=1.08 CUM
1.3/6*1=.216CUM
.216*1440=311.04KGS
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What do we mean by partial moment release ??
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
Define a polyline?
How many kilo-newtons equals 1000 kilogram?
how we calculate the grade of the Bituminous materials.?????
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is the meaning of soil reinforcement?
What is the difference between 53 grade and 43 grade cement
how to take concrete quantity for precast segment for viaduct project?
Material calculation of cm 1:6 for 1sqm
What is bmc stands for in bmc software?
What are the applications of the modulus of elasticity?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?