Answer / lokesh verma
construction joint we provide between new and old concrete work
We give expansion joint in building because the effect of thermal expansion in concrete and steel can damage the structure.
Is This Answer Correct ? | 58 Yes | 1 No |
to make a monolithic structure between old and new concrete portion in member it is proposed special condition by providing L groove or joining chemical/materials is called construction joint.
Due to thermal condition concrete may shrink/expand, to avoid failure of structure due to thermal condition it is proposed to provide gap between structure , this gap called expansion or thermal expansion joint.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / chouhan
Construction Joint are providing for continues of Structure. normally we R making structure by span so to connect the one span to another span we r making construction Joint.
Expansion Joint R providing for keep gape between two structure due to consideration of earth quick.
Is This Answer Correct ? | 2 Yes | 17 No |
Answer / mohamed zubair
construction is given to connect the two structure for
example u r making column means it will go up to 50m
height means but u put only 3m means ofter curing u r
making reaming lenght of the column means u want to chipp
the that conctete and the u whant make the remaning column
its called construction joint
Is This Answer Correct ? | 2 Yes | 38 No |
how many nails in 1 sq mitar
construction workers how much time take one work or qty
HOw many cement bags are required for M35, M40 & M45 grade of concrete?
what is the most suitable foundation when construct a bird watching tower in a marshy land
Which IS code is used for scrap of reinforcement steel?
if i want to change the dia of some bar in a structure,then which formula should be used to find the spacing for the bar of new dia?
How to calculate per inch area in a circle?(Dia is 2.17m)
WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP
The foundations are placed below ground level, to increase?
Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in