Dear all,
Will some one help me in this issue please?
We are entering the Zero Stock Component in Maintenance
Order, and we make a Check when the order creator is going
to release system will appear Error, until he will not
delete that zero stock components from the Maintenance
order. but right now what the order creator is not releasing
the order but he is going to save order, when's he save the
order without release system will generate Reservation in
the back ground, which should not happen for Zero Stock
Components ? I need the way which we are doing in MB21,
Reservation creation by thru Cost Center / WBS Element. At
present if you run MB21 and you are going to issue the
material system will not allow to generate the reservation
if there are zero stock components in the list. please guide
me for this issue ?
Note : Simple what I need is I don't want to create any
reservation thru maintenance order for the Zero Stock
Components.
Regards,
Abdul Mujeeb
No Answer is Posted For this Question
Be the First to Post Answer
What is the torque required at M6, M8, M10, M12, M14, M16, M18, M20, M22, M24 Bolt or give me any chart for this?????????
Why iso-octane is chosen as reference fuel for s.i. Engines and allotted 100 value for its octane number ?
How do you determine what suction pressure should be in r22 air conditioning compressors suction line?
What trouble could result if the main engine is using a low grade of fuel?
What do you measure in the banana and mountain diagram?
how works optical pyrometer ?
What are the typical indicator diagrams?
Water is available at 10m height. What is the pressure available ?
What are the conditions considered while evaluvating MARGIN OF SAFETY for newly designed mechanical components....? or Explain its steps...??
tell about Automobile engineering
What are various types of brakes?
What will happen if there is moisture in refrigeration system?