Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is Goerges phenomina to start SYCHNOUSMOTOR?



What is Goerges phenomina to start SYCHNOUSMOTOR?..

Answer / siva

The Goerges phenomenon is the operation of a 3-phase wound-
rotor induction motor at half of synchronous speedand it is
obtained by unbalancing the rotor circuit. If the motor is
started with one rotor phase opened or with rotor
impedances greatly unbalanced, it will accelerate to half
speed and operate stably as a motor or generator.The motor
may be operated stably at half or full speed. The torque at
half speed is greater than at full speed, and may be almost
as great as the rated torque for a balanced rotor. It may
be desirable to operate an induction motor at half speed
intermittently or as a temporary measure. Disadvantages of
half speed operation are the low power factor, low pull-out
torque, the subfrequency line currents, and motor
vibrations.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

differtiate between energy consevation and energy efficiency..

1 Answers   L&T,


difference between substation & grid substation?

2 Answers   GMR,


what are the problems that generally occur in power flows??

1 Answers  


What are the advantages and disadvantages of open loop control system?

0 Answers  


Explain the working of variable frequency transformer?

0 Answers  


In case of 3 phase motor why it is called single phasing by failure of one phare unless there is rest two phase are acting. ?

3 Answers  


I have 30 kw motor load & i have selected 10 kvar capacitor bank for power factor improvement.my existing p.f is 0.85 & proposed p.f is 0.99 so ,is it right selection? 2 nd question how to connect c.bank whether in delta or star connection & how to decide it?

1 Answers  


If 24 KVA AVR having Input voltage 200-400v, Output voltage 415+-1%, what will be the voltage if Load is 13A.

0 Answers   Sterling Wilson,


Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.

0 Answers  


why reactive power control is required

5 Answers  


using n1*n2 which type transformer is made; where n1 is primary turn and n2 is secondery turn

1 Answers   JSW,


circuit diagram of trip circuit supervision relay

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)