for Precast foundation howmany days required we can shift
the foundation with american Standards
i need reference with section any body can help
No Answer is Posted For this Question
Be the First to Post Answer
Water cement mixing in hopper less mixture machine is better than hopper mixture machine because:
what is ph value of water
for concrete cubes samples.. what if the 7 days gain the strength of 42.34 mm/2 and the 28 days only gain the strength of 37.5 mm/2?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?
deshuttering time for RCC for DPC over the foundation.
how to calculate rate analysis of M25 grade concrete
8 Answers Nagarjuna Construction, Simplex,
what is the ratio of m50 grade in concrete block
where vr providing singly reinforced beam. i want to know the location of it in a building
how to determine H- zone in a column? where it will occur?
In T beam design, which are the regions selected as rectangular and Flanged ?
How can I calculate the Compressive strength of cubes after 28 days of curing?Is there any formula or ration ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)