for Precast foundation howmany days required we can shift
the foundation with american Standards
i need reference with section any body can help
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
Why should pumping be not used in case of concreting works?
how to find water-cement ratio perfectly proportions M20, M25, M30
appsc AEE'S interview questions wanted
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
Are you good at detailing and explain about the project you have worked on detailing?
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
What is the standard size of a brick used in North India?
How many steel is require in one cubic meter area?
What is IS ?
how to calculate cement bag in RCC
16 Answers Anas Trading, Bosch, Karnataka Bank, L&T, Satpura, Supertech, Tata Goldplus,
Formula of area of crane hook
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)