Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to connect surge arrester with equipment?



How to connect surge arrester with equipment?..

Answer / razif matsaat

Depending on the configuration, the surge protection device (SPD) may be connected in shunt mode or in series. usually, the latter has a set of surge diverting components and a set of high frequency filter to further attenuate high frequency component of lightning surge current. The simpler one;the shunt type; usually has simpler surge diverting component such as Metal Oxide Varistor (MOV) and/or Zener Diode and/or Gas Discharge Tube (GDT).

You will now how to connect by looking of the cables poking out of the SPD. If you have (for single phase) only a set of L,N,G, it's usually shunt type. If you see 2 sets, well of curse it's the series one. Hint: look at the diagram of connection supplied with the device.

Be extra cautious when you do termination of the grounding cable though. From my experience, the grounding termination (cable length, bending,size and route) is very important regardless of how good your SPD you choose.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how much current in live 11 Kv distribution Line?

1 Answers   ABB,


is the value of inductance depends upon the value of thitha in doubly excited machine??

0 Answers  


Hi friends, i m electrical engineer i want a cdr for migration purpose so anybody have information about this then send me on jayesh_ee88@yahoo.com.please try to me

0 Answers  


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

0 Answers   BUET, VECL,


why no load voltage is greater than full load voltage?

1 Answers  


Is there any scope for an electrical engineer in MRF company......

1 Answers  


Why iron core transformers not used in high frequency applications ?

3 Answers  


what is the use of megger? and types

11 Answers   TNEB Tamil Nadu Electricity Board,


what is bus post insulator and its applications in substations

1 Answers  


line diagram for mcb , mccb , rccb .

1 Answers  


why receiving end voltage increases in a system when capacitive load is added

1 Answers  


what is the minning of propotional, integral, derivative ?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)