how the synchronizing is obtained at bus couplers in grid
substation? (because there we cannot change the frequency in
one of transmission lines like in generator synchronization)
Answer / Punit Kumar
Synchronization at bus couplers in grid substation is achieved through a process called Voltage Riding. This involves slowly matching the frequency and voltage of the new transmission line to that of the existing one by gradually increasing or decreasing the transformer tap settings.
| Is This Answer Correct ? | 0 Yes | 0 No |
how to claculate earth strip size for 1500kVA transformer for neutral and body
what are transmission line parameters and transmission line constants?
What is switching over voltage?
how calculate the electrical load for industry and office
What is CBCT ? Why & Where it is used?
ther is any difference if we use 240 V A.C,50 Hz,1 Ph. in place of 230 V A.C,50 Hz,1 Ph.
what's the outstanding feature of universal motor?
Why transformer making sound during operations?
Brief me about maintenance planning & sheduling of machine tool.
can i used 400A SFU (for the use of PA fan motor),if my BUSBAR rating is only 315A?????answer me quickly as possible.......thanks
i have 2 motor of same rating. on no load condition one motor take 1.6A but other motor is taking 4.8A. what is the reason of this. please explain with proof.
why we decide alternating wave form in ac system and not in dc system
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)