what is mant by point of conter of fracher(p.c.f)
Answers were Sorted based on User's Feedback
Answer / vijayakumar.s
The point where Bending moment chenge its sign(ie.+ to -)
in other words the point where BM becomes zero.
Is This Answer Correct ? | 19 Yes | 0 No |
Answer / saroj
actually question is wrong...it is point of contraflexure..
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / saif raza
From above also this is the point where no moment is
produce.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / kishan
that point where hogging and sagging moment are meet
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / pramod naik
where the shear force is zero & bending moment will be maximum.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chandan kumar singh
Where S.f changes sign B. M is max at that point and shear force is zero.
Is This Answer Correct ? | 0 Yes | 0 No |
how many bags of cement are needed to make a cement mortar of 1:3
5 Answers ABC, DBL, DHFL Dewan Housing Finance Corporation, VV, WADAN,
what are the diffrent kind of grades in concrete and what does M means while specifyng the grades?
What is an object snap mode?
One unit equal to how many brick
3 Answers Sainath Infrastructure,
As per Method of measurement how to calculate no of column stirrups (ie: upto slab bottom or beam bottom)
How Many Cement Bags Are Used in 1 Sqm Area for Plaster????
8 Answers Era Infra Engineering, FactSet Systems, Indu Projects, L&T, Reliance, Rites,
In Earth work compaction How u calculate How many liters of water required,for compaction of ordinary soil for one Cu.m.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Why are the bolts that hold steel rails together in oval holes?
What Should be the CBR Value for Transported (Selected) Soil.whether it can be 5% or not ?
the minimum percentage of steel for 2m rcc slab
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?