What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building)
area of RCC?






Answer / kailaspaithane

It totally depend on design and load basis

Is This Answer Correct ?    0 Yes 0 No

Post New Answer




More Civil Engineering Interview Questions

How many type thickness vibrator used in concreting,,?

4 Answers   Supertech, Raheja,


how to control PQI (Project Quality Index)

2 Answers  


What is rate of concrete surface rendering work per sqm

0 Answers  


Bernaullis theorem deals with the law of conservation of mass momentum energy none

0 Answers  


How to fix steel in rectangular footins? I.e first along the length or first along the width??

1 Answers   NKG Infrastructure,


What is stripping?

2 Answers  


component parts of a weir

4 Answers   Infosys, L&T, Zamil Steel,


What is the correct position of lapping splice of reinforcement steel bars in a beam at top & bottom of the beam?? what is the reason for this location?..what are the factors affecting lapping location in beam?

6 Answers   SPCL,


What is indicate Fe250 in steel structure?

2 Answers  


what is kribs is supporting?

0 Answers  


How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit

0 Answers  


how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?

4 Answers  




Categories
  • Civil Engineering (4587)
  • Mechanical Engineering (3708)
  • Electrical Engineering (15661)
  • Electronics Communications (2629)
  • Chemical Engineering (736)
  • Aeronautical Engineering (78)
  • Bio Engineering (30)
  • Metallurgy (95)
  • Industrial Engineering (198)
  • Instrumentation (2854)
  • Automobile Engineering (225)
  • Mechatronics Engineering (41)
  • Marine Engineering (60)
  • Power Plant Engineering (166)
  • Engineering AllOther (1326)