what is mant by point of conter of fracher(p.c.f)
Answer Posted / vijayakumar.s
The point where Bending moment chenge its sign(ie.+ to -)
in other words the point where BM becomes zero.
| Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What are the advantages of building a dam on the river nile?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
why & what is perchatage we are using fly ash in concrete?
For a washout valve why are two gate valves required in normal practice?
Explain the different types of roofing systems?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is rolling stock
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
detailed calculation of the amount of cement used?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What is the absolute pressure scale?