what is test plan and what it consists?




Answers were Sorted based on User's Feedback



what is test plan and what it consists?..

Answer / suresh

Test plan is a strategic document in order to do testing.
it consists of test plan id, reference documents,Revision
history,Test schedules,Test Item,Test
process,Resources,Risks and mitigations,Training..those type
of info..

Is This Answer Correct ?    63 Yes 18 No

what is test plan and what it consists?..

Answer / ashok.yerrala@gmail.com

test plan is company lever docutment it defines object,
scope, resourse and scheduling the testing process.
testplan identifies test items, testing approch, features
to be tested,..
this document maintain good relationship between client and
testing team
contents:
objective, scope, test approach, entry cryteria, resources,
exit criteria, roles and responsibilities, testing tasks,
need any tools,deliverable, reverences, signoff

Is This Answer Correct ?    56 Yes 14 No

what is test plan and what it consists?..

Answer / ch.s.m.prasad

Test plan: it is a statagic document. It consists of
objectives ,scope ,approach and focus in software testing
effort.
it is prepared by Test Lead
in this phase he will prepare Test plan Document.Here he
has follows the below approachs
1. what to test
2. who to test
3. how to test
4. when to test.

Is This Answer Correct ?    43 Yes 11 No




what is test plan and what it consists?..

Answer / ramachandra naidu

Test plan:It describes how testing will be accomplished.It
is very essential for effective testing and it will take
about one third effort of the total test effort.It is a
contract between the testers and the project team and user
describing the role of testing in the project.
It consists of
1)Test scope 2)Test Objectives 3)Assumptions 4)Risk Analysis
5)Test Design 6)Roles and responsibilities 7)Test schedule
and resources 8)Test Environment 9)Communication approach
10)Test Tools

Is This Answer Correct ?    32 Yes 13 No

what is test plan and what it consists?..

Answer / sara

it consists

1.1 Introduction: 5

1.2 Scope: 5
1.3 Features to be tested: 5
1.4 Features not to be tested: 5
1.5 Test Strategy 6
1.5.1 Black box testing: 6
1.5.2 Smoke/sanity testing 7
1.5.3 Functional testing 7
1.5.4 Compatibility testing: 7
1.5.5 Web testing: 7
1.5.6 System testing: 7
1.5.7 Recovery testing: 8
1.5.8 Security testing: 8
1.5.9 Load testing: 8
1.5.10 Volume testing: 8
1.5.11 Stress testing: 8
1.5.12 Performance testing: 9
1.5.13 Retesting 9
1.5.14 Regression testing 9
1.5.15 GUI testing 10
1.5.16 Cofiguration testing 10
1.5.17 Database testing 10
1.5.18 Ad-hoc testing 10
1.5.19 Exploratory testing 11
1.5.20 User interface testing 11
2.1 Suspension 11
2.2 Resumption Criteria: 11
2.3 Entry criteria 12
2.4 Exit criteria 12
3.0 Environment 13
3.1.1 Workstation 13
3.1.2 Application Server 13
3.1.2 Database server 13
3.2 Software Required 13
3.3 Roles and Responsibilities: 14
3.4 Test schedule: 14
3.5 Deliverables: 15
3.6 Training plan: 16
4.1 Risk Management: 16
4.2 Control Procedure: 16
4.2.1 Reviews: 16
4.2.3 Defect Reporting: 16
4.2.4 Defect Prevention Meeting: 17
4.3 Dependency: 17
4.3.1 Personal 17
4.3.2 Software: 17
4.3.3 Hardware: 17
4.3.4 Test Data: 17
4.4 Approval: 18

this is my current p

Is This Answer Correct ?    33 Yes 18 No

what is test plan and what it consists?..

Answer / prasanna laxmi

1. it consists of test plan id, reference documents,Revision
history,Test schedules,Test Item,Test

2.testplan identifies test items, testing approch, features
to be tested,..

3.objective, scope, test approach, entry cryteria,
resources,
exit criteria, roles and responsibilities, testing tasks,
need any tools,deliverable, reverences, signoff

4. Test plan:It describes how testing will be
accomplished.It
is very essential for effective testing and it will take
about one third effort of the total test effort.It is a
contract between the testers and the project team and user
describing the role of testing in the project

6. Consist
1)Revision history
2)Introduction
3)Objective
4)Process
5)Test Strategy
6)Entry/Exit Criteria
7)Schedule
8)Milestone
9)Deliverab

7. what to test
1. who to test
2. how to tes
3. when to test.

Is This Answer Correct ?    9 Yes 5 No

what is test plan and what it consists?..

Answer / sreepal

test plan is a doc. That gives entaire idea about the
testing. it mainly consists of Objective, scope,
approches,and focus of the s/w testing efforts, .it mainly
consists of Objective : it specifies goal.
scope : How to fullfil the objective and that are the
process we need to impliment.
Approch: what are the testing approches and testing
techniquecs we need to take
pass/fail: createrial
entry/ exit creatirial.
schedules.
risk anlysys:
which features to be te not to be test:
which deliverable we need to submit at the end of testing:
which to we need to use :

Is This Answer Correct ?    20 Yes 18 No

what is test plan and what it consists?..

Answer / bhuwon

Test plan is a document which drives all future testing activities...This is where we decide,how many engineers are needed,Who should do what,how to track defects etc.
The contents of test plan are:Objective,Scope,Approach,Assumption,Risks,Mitigation Plan,Test automation,Schedule,Defect tracking,Testing methodologies,Entry & Exit criteria,Deliverables,Test Environment,Roles & Responsibilities and Templates

Is This Answer Correct ?    3 Yes 2 No

what is test plan and what it consists?..

Answer / appalraju

test plan is any thing for testing and know as plan of
testing
it makes easier for testing
its like cricket schedule for world cup

Is This Answer Correct ?    4 Yes 4 No

what is test plan and what it consists?..

Answer / jayadev biswal

Test plan is a document which drives complete testing activities for the successful delivery of the project.
It contains mainly 16(This may vary from company to company) sections.Those are
1>OBJECTIVE
2>SCOPE
3>APPROACH/TEST STRATEGY
4>TESTING METHODOLOGIES
5>ROLES & RESPONSIBILITIES
6>TEST DELIVERABLE
7>TESTING ENVIRONMENT
8>ASSUMPTIONS
9>RISKS
10>CONTIGENCY PLAN (or) MITAGATION PLAN
11>ENTRY & EXIT CRITERIA
12>ESTIMATIONS

etc........

Is This Answer Correct ?    4 Yes 4 No

Post New Answer



More Manual Testing Interview Questions

WHAT IS TESTLOG?

6 Answers  


hi.... plz tell me what all kinds of documents/reports are required for manual testing of a simple website(simple static pages). in a organization.

2 Answers   HCL, IBM, iPRO Solutions,


How you will do the functional testing ?

5 Answers   CTS,


Is it possible to have a defect with high severity and low priority and vice-versa i.e high priority and low severity? Justify,if possible? give a example?

5 Answers  


write test cases on calculator

7 Answers   EDS, Sify, United Healthcare, IT Logic,






wat if fiddler and how it is used in tesing an application. please explain with a real time scenario

0 Answers  


what is functionality testing?

8 Answers   Cap Gemini,


Hi Friends, I have recently completed Testing course and planning to apply for jobs, I am Planning to put Banking Project in my resume but b4 that I need your help guys According to my knowledge in the banking project basically it contains 3 modules say 1. Banker 2. Admin 3. Customer Could you please explain me in terms of interview like how to explain each module and what exactly each module does and what type of testings we can do on banking project. Any help would be appreciated Thanks in advance Swapna

1 Answers  


What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client

0 Answers   Mphasis, Netxcell,


Can you please explain me about the types of Reviews?And which reviews are done by whoom?like Author,moderator etc..? Thanks for posting the Answer...

2 Answers   CTS,


When to start and Stop Testing?

7 Answers  


What would u do if u come across a bug...report it.....but the programmer is in a diff location ( say u in India n he is USA)..and he keeps accepting its a bug?

3 Answers   AZTEC,






Categories