if rise and tread of stairs rae 16 & 25cm with landing slab
of thickness 100mm . If there are 8steps, and carpenter ask
for to mark the bottom of centering of landing on column,
what will be the height above floor finished level?
Answers were Sorted based on User's Feedback
Answer / karan sardana
8 steps=> 9 risers...
therefore 160*9=1440mm
now deduct 100mm slab thickness=>1440-100=1330...
therefore reqd height=1330mm
Is This Answer Correct ? | 9 Yes | 1 No |
Answer / sunil1505
there is no need to deduct 100,,ans is 1440, slab include in
raise.if not include the last raise become 260.so ans is 1440
Is This Answer Correct ? | 4 Yes | 3 No |
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
why you considers yourself suitable for the post of site engineer
5 Answers Consultancy, Nalco, Ritspin Synthetics,
what is pouring and explain
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
What is the wastage % of concrete in Conventional shuttering design & Mivan Shuttering for high rise building.
rate analysis for cement pointing 1:4 , for 100 sq m
Is there any alternate for plastering
what is total volume of ingredients used in concrete accordingly
Which prize is the alternative to the NOVEL Prize?