if rise and tread of stairs rae 16 & 25cm with landing slab
of thickness 100mm . If there are 8steps, and carpenter ask
for to mark the bottom of centering of landing on column,
what will be the height above floor finished level?
Answers were Sorted based on User's Feedback
Answer / karan sardana
8 steps=> 9 risers...
therefore 160*9=1440mm
now deduct 100mm slab thickness=>1440-100=1330...
therefore reqd height=1330mm
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / sunil1505
there is no need to deduct 100,,ans is 1440, slab include in
raise.if not include the last raise become 260.so ans is 1440
| Is This Answer Correct ? | 4 Yes | 3 No |
what do you mean by 'redistribution' of forces?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
ratio of rcc 1:1.5:3 grade of concrete ,7days& 14&28 days after curing how much strength of compressive strength in rcc slab
what is mean by "SQP"
how lap length is increased with increase of Grade of steel?
what is the nomimanal size' os agg.'for reinforced concrete 2 th ph value of water to be used in conc. Shall generly be
How do you determine specific gravity of cement?
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
how gradation of aggregates effect on slump of fresh concrete?
Calculation of Pier Cap with tapper area?
What is grouting? Why it is done?
how to prepare site mix design
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)