There is one 40MVA oil cooled transformer (yet to
commission), filled with 95% oil and we are trying to fill
5% Nytrogen in that transformer so that there should not be
any foreign component inside. But even though there is no
leakage, nytrogen is not withstanding inside transformer,
within a day or two pressure guage is showing 0. Why is it
soooo? Pls reply.
if we increase the frequency given to a transformer then wat will happen to the transformer size, whether it will increase?
what mean by power factor
What principle and operation of frency drive
when two gen set runing in parallel but thay have diffrent pole pitch, then what will be happan
why we use stones or rock pieces in transformer area?
What is the tolerence limit between neutral and earth in 230 V AC System?
Why overhead transmission line in triangular shape?
What do you mean by 4.44 in this transformer equetion E=4.44 nfqm
why trip circuit supervision is taking through breaker contact? what happen if takendirectly?
wat is the current produced in a 5000v megger? when the positive and negetive terminals are touched on our body get s shock?
What are the protections to be used for Generator?
difference between generator and alternator
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)