What is maximum demand?How can we caluclate it?
Answers were Sorted based on User's Feedback
Answer / natha
on the basis of load curve it is calculated.if suppose you have to find the max demand(md)of ur house plot time on x axis units consumed on y axis.you get supppose 2units 6am 30 7am 42 8am 5 9am.....till midnight.then ur max demand is 42units.all other factors such as load factor,diversity factor can be found.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shamsher singh
the maximum demand is the plant maximum load allow the state
electrical board on 500 kva we can use the load inside the
limit that in sanction load by the state electrical board
for a example our transformer is 500 kva and according
to power factor we calculate in standard 500*0.9=450kw .we
authorized only 450 kw only.govt authorized me only 450 kw
we cross the limit we pay the penalty
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / lohith
75 percent of the
contract demand.
Its multification
factor is cubical
meter ct ratio into
pt ratio
| Is This Answer Correct ? | 0 Yes | 1 No |
what heppend if we are connected u1-v1-w1 as a star point in the place of u2-v2-w2 in power genration
i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle
Sir if i have 2kv ups in which 17ah 8 battries load 600watts how much back up time i get and if i put 6kv ups with the same no of battries same amp can i get more back up time please give reply exactly what is the procedure to calculate back up time for different kv,s
HOW MANY EARTHINGS REQUIRED FOR GENERATER
Hi,iam a diploma in electrical engineering.rtd from indian air force in apr 2007.prsently working in reliance next link as a network maintenance engineer since 2007,can i get a job in motherson sumi.
0 Answers Motherson, Motherson Molds and Diecasting Ltd.,
why u want to work in sail/ntpc as u r already in an it company where life is good, good environment no much tensions etc?
Star Delta Diagram with full description
0 Answers SKS Microfinance, Syscom,
the distance from my office to d.g is aprox 400mtrs and voltage drops ibn my office near about 40 volt what should i do p[ls suggest.
what is high tension ? specify the range?
What is the permissible value of earth resistance!
What is the resistance to be connected for supplying the load of 20mV,1kohm from 20mV supply using rectifier.
why there using acb enclosure in big buildings
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)