What are the site acceptance tests for power cables, DG
Sets, LT panels & 30kVA UPS ?
No Answer is Posted For this Question
Be the First to Post Answer
what precautions to be taken while desigining a LT,HT panel. Eg-LT panel PCC panel with ACB installed. HT panel VCB panel with VCB installed. & what is main diffrence betwn IP54 & IP55 construction of panel.
Our Alternator nameplate specifies a power factor of 0.8. When the Alternator is on light load, the bus bar voltage rises to 11240 volts, whereas the standard value is 10500 volts. Is it ok to increase the power factor to 0.85 or 0.9. I am afraid because the power factor on the name plate is only 0.8 ?
what is work of CTPT in 33/11kv Substation
string efficient is 100% what is the voltage across the each disk?
what is principle operation of transformer?
Tan delta point in transformer to be earth or not?
can motors working at parallel operation like D.G set and transformers? It means asking about two motors coupled with same load???
what will happen if we directly give supply to rotor of a induction motor?
why neutral can not used in three phase motor connection?
what are the advantage and dis-advantage of 3 phase 4 wire energy meter?
How many no. of earthing pits required for commisioning a new 320KVC DG Set????How????
why commutator are not used in rectification purpose in power electronics?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)