If load current is 70amps or 50amps what range of CT to
install for ampere metering

Answers were Sorted based on User's Feedback



If load current is 70amps or 50amps what range of CT to install for ampere metering..

Answer / maprayil

Always go for the CT primary suitable for about 40% higher
currents of the load current. So if the load current is
70A, you should opt for a CT primary of 98A, say 100A.
Secondary current rating of the CT will be dependent on the
input requirements of the measuring instrument (meter)/
Controller. Many such meters specially calls for an input
of 5A or 1A. Certain meters have the option to select 5A
or 1A input based on the secondary current of the CT.

Is This Answer Correct ?    10 Yes 1 No

If load current is 70amps or 50amps what range of CT to install for ampere metering..

Answer / sreekar

i think u have to use 100/5A by considering initial load
currents.

Is This Answer Correct ?    6 Yes 0 No

If load current is 70amps or 50amps what range of CT to install for ampere metering..

Answer / g.bhaskarrao

CT range is 70/5A because it caluculates min to max current

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

how to find three phase complex power in per unit and MVA?

0 Answers  


What is the difference between induction motor and the Synchronized one?

4 Answers   Foxconn, Sabic,


How to calculate the current carrying capacity of electrical cables

16 Answers   Barqaab, Grasim, Havells, HM Cables, Janapriya, Polycab,


What is rccb?

1 Answers  


difference btw neutral and ground?

2 Answers   ERG,


Why mostly conductor made by 7 nos wire?

2 Answers  


What is ignition module of a CAT Gas Genset G-3508 Engine, Alternator SR4B Series. HOw its checked for correct functioning.Is it repiarable or replacable?

0 Answers  


explain why core loss of a transformer is almost constant under different load conditions when connected across a constant voltage and constant frequency.

0 Answers   MPPGCL Madhya Pradesh Power Generating Company Ltd,


What do you mean by reach and reach the point of the relay?

0 Answers  


For testing 33kv cable hipot testing. How much kv we have to Apply .Give in details.

24 Answers  


aeroline vibration is present

1 Answers   DVC,


Ohms law explain

1 Answers   Hetero,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)