I am selected in OCL(Orissa cement Limited), but they have a Tech PI round their at their plant.Anybody has any idea that what kind of questions they are going to ask??Please guies help me. I am in serious headache.I have heard that huge elimination is done at there.
No Answer is Posted For this Question
Be the First to Post Answer
Why do we apply both Differential and REF (HV and LV) protection schemes on YNyn configuration of a transformer?
what is the difference betwteen overcurrent and short circuit fault?
I've descovered that when the earth wire in a domestic electrical installation is not connected back to the board (ground) a voltage of between 9-24v is is found to be present in the earth wire. When connected at the board there is no voltage - is this normal and why does it happen?
what are tpes of insulaors& its uses
if i have to use 14 kw what size of power cable can i use and size of earth cable also.
How many earthings are required for commissioning the Transformer?
wat is the first thing dat is needed, 2 lay a cable in some area??
Difference Between Differential Relay and Restricted Earth Fault Relay of Power Transformers
What is AVR in Generators and How is it working.
What is Tachometer used to measure?
150 hp moter how many kwh in 1 hour and what forfula 3 phase kwh.
5 Answers College School Exams Tests, CPCL, Syncom, Thermax,
Explain how you intend to work under pressure to meet up with deadline target?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)