I am selected in OCL(Orissa cement Limited), but they have a Tech PI round their at their plant.Anybody has any idea that what kind of questions they are going to ask??Please guies help me. I am in serious headache.I have heard that huge elimination is done at there.
No Answer is Posted For this Question
Be the First to Post Answer
Difference B/W A/C & D/C Motors..?
WHY IS wet surface used for grounding???
AC covered area by ton calculation
How can calculate the earthing strip of Copper/GI for rating of 30kV,discharge current 10KA Lightning arrester.
What is thermal relay and how it is works in transformer please explain
Fot testing new star-delta 132 kw motor in electrical worshop.we should check in star or delta connection as we do not have higher capacity cable in worshop?
What is miller crystal oscillator? Explain its operation?
can we use only a isolator in the subtation..
How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test?
what is corona
what is MC 61 relay
what is strip power factor?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)