I am selected in OCL(Orissa cement Limited), but they have a Tech PI round their at their plant.Anybody has any idea that what kind of questions they are going to ask??Please guies help me. I am in serious headache.I have heard that huge elimination is done at there.
No Answer is Posted For this Question
Be the First to Post Answer
why power generate in 33 kv it will be step down by 11 kv .
What is the de rating factor of cable? What is the importance of the de rating factor in cable select
How we calculate airgap between phases & terminal box of the transformer? any formulae.
WHAT IS A DIFFERENCE BETWEEN A DC GEAR MOTOR AND STEPPER MOTOR.AND WHICH IS MORE APPROPRIATE TO USE FOR POSITION CONTROL PURPOSE?
what are the protection relays for trasformer
what will happen if dc motor given ac supply
What is Hot reserves and spinning reserves?
How to Make relay co ordination chart for a Electrical power distribution of a plant
What is the limitation of kirchoffs law?
What will be the output of an alternator ,if the field current is single phase ac supply.
How we can calculate the Amps for the cable Ex:- For 1sqmm wire how many amps we can draw (calculation)
is the electrical energy photo copy possible or not???????????? give me some idea about that i m very great full tu u.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)