how much nails used in 1 sq m shuttering
Answer Posted / furqan ansari
Required nails for shuttering .100 to .150 kg./sqm
| Is This Answer Correct ? | 184 Yes | 117 No |
Post New Answer View All Answers
Why Vitrified tile are getting pop up.
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
Define What is the origin of name Railway Sleepers?
it is a corrected question." make a list of engineering property(properties) of soil.
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
what is the relation between pitch of steel and depth of slab?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
Define What is a projection line?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How to calculate chejja reinforcement
How can you distinguish between sorption, absorption and adsorption?
How to find CN by using arcgis 9.3?