What is expansion joint
Answers were Sorted based on User's Feedback
Answer / madhu
is the joint provided in between two buildings or two
component to protect aganist temp.....
Is This Answer Correct ? | 12 Yes | 3 No |
Answer / vimalsekar
Expansion joint is a joint made with bitumen+sand + cement
mix . Expansion/contraction joint is given in a concrete
structure in order to take care of expansion/contraction in
concrete due to variation in temperature.
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / atul panth
this is the joint which is provided for lateral and longitudinal movement as like in earthquake and from the prevention of expansion due to heat
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / guest
These are joints provided to prevent cracks and also the
length to reduce
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / shalender kumar
THE JOINTS WHICH PERMITS TO ALLOW EXPANSION AS WELL AS CONTRACTION IS THE EXPANSION JOINTS.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / balachandra mahendra
a joint that makes allowance for thermal expansion of the parts joined without distortion.
Is This Answer Correct ? | 1 Yes | 0 No |
what is normally consolidated clay and over consolidated clay?
HOw much % of premium on DSR-2013 currently
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
what is the load capacity of bored pile pile dia 500mm
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
What are the methods of measurement? Describe it shortly
Percentage of wastage of cement ? Please mention IS code and clause from where I get it.
whats is difference between anchorage length and development length
what is bitumen emultion where it is use
cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?