A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
This problem can be solved using fractions also.Work done in
one day is 1/14. Out of this, A' contribution is 2/3and of B
itis 1/3.So A does 1/14 x 2/3 i.e. 2/42 of the work and B
1/42.Hence A alone takes 21 days to complete the work ,and B
42 days.
Is This Answer Correct ? | 19 Yes | 4 No |
Answer / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
Is This Answer Correct ? | 17 Yes | 4 No |
what is mean by xlpe swa pvc
State the formula for overall efficiency of thermal power station
In star and delta connected systems , for driving power and as well as light load which one you will preferred?
why u want to work in sail/ntpc as u r already in an it company where life is good, good environment no much tensions etc?
how many amps in 1 KVA? V=440v, PF=0.8 and FREQ=50Hz
It is observed that AVR of an Alternator is more likely to fail if the Generator and Mains Neutral are directly connected to each other. Why should this be so?
Though transformer consist winding which usually cause reactive power change in both generator and motor but it wont affect reactive power passing through transformer why?
why the crow do not feel the current in overhead line when it sits on the wire??????
1. What are the tests to be carried out for CBCT? 2. can measure the secondary resistances? 3. with respect to secondary maximum how much voltage can be applied for IR test.
Explain few advantages of electric traction system?
Hi friends. m 3 years drop. now d company asks in d interview d reason 4 my drop.what shud b d probable answers 4 that which may not put a negative impression.
who invented active elements? plz give me the complte details of active elements...