A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
This problem can be solved using fractions also.Work done in
one day is 1/14. Out of this, A' contribution is 2/3and of B
itis 1/3.So A does 1/14 x 2/3 i.e. 2/42 of the work and B
1/42.Hence A alone takes 21 days to complete the work ,and B
42 days.
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
| Is This Answer Correct ? | 17 Yes | 4 No |
Wat wil happen if Transformer is operated at 100 HZ Frequency?
what is an alternator & generator
WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT
current cyring capacity of .75sqmm copper cable
Railway Basic electrical engg technical question with answer
Define current?
which motor will u use in refinaries?
WHAT IS THE USE OF EARTH SWITCHES?
how terminal voltage increases when load is capacitive (leading pf load)? (explain practically what is happening, not using phasor diagram
How the frame size of a flange mounted AC induction motor is calculated?
how to convert star network in delta or vice versa...?
Can I use less voltage cable for neutral, since the voltage of return path is zero ideally?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)