A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
| Is This Answer Correct ? | 17 Yes | 4 No |
Post New Answer View All Answers
What is the earth treantment procedure?
please send the last 5 years {{{JUNIOR ENGINEER - ELECTICAL, ELECTRONICS RRB CHENNAI and secundrabad}}} TECHNICAL question papers TO MY EMAIL ID dinesh100701@gmail.com
what is the difference between Power and Distribution transformers ?
WHAT ARE THE DATAS REQUIRED FOR PROTECTION AND METERING AND CONTROL AND LOGIC PREPARATION,HOW TO STUDY THE PROTECTION AND METERING?
What is the difference in calculating size of AC cables compared to calculating size of DC Cables? Usually DC Cables are larger than AC Cables although they have the same ampacity. Why is it?
What is the difference between shortcircuit current, rated current of cable & MCB with example? What will be the size of cable required for 5.5 KW motor (Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.
what are the things that can cause a three phase motor to crawl?
What is the function of capacitor in electrical circuits?
Trafo ratio is 11kV/6.6kv,Vector group is YND11. What will be the effect if secondary is used for earthed system.
What is the most essential condition for the voltage build up for a d.c. Shunt generator?
what is the ATS .And how it works.
what is the value of combined earthing in general electrical circiut?
what is your aim
What will be result if we connect LT votage to the terminal of HT motor?
can i use ups power as a raw power for another ups