A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
| Is This Answer Correct ? | 17 Yes | 4 No |
Post New Answer View All Answers
why ct's&pt'S out put called as burden,why compelsary short ckt the secondary of ct's while removing the burden?
Write the current equation in series RLC circuits.
how much winding resistance of 0.75kw to 12.5kw 3ph sqwiralcage induction motor?
How do we calculate the Out put voltage of generator, after the excitation is being given?
If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?
What is grid collapse? what is the reason for it?
what is draiv work
When can we take Neutral as common neutral link?
Is it a better option to procure screw type air compressor rather than reciprocating air compressor?If so, what is the reason?How should we select an air compressor(100 CFM)? Please mention the important parameters of air compressor.
what is the difference between megger and earth resister ??
I have one ct of ratio 3000-2000/1 Amp its knee point voltage mentioned on name plate is 500-333/30mA-50mA at Vk/2. in secondary box there is three terminal named 1S1, 1S2, 1S3 then on which terminal obtained the knee point voltage ie 1S1-1S2 OR 1S1-1S3 & also specify the knee point voltage for the ratio 3000 from name plate.
Explain bypass capacitor?
Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.
how can decide the current rating of oltc
hey guys help me out.....what are the industrial uses/functions of nozzles in industries