A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / k.prakashchandra
This problem can be solved using fractions also.Work done in
one day is 1/14. Out of this, A' contribution is 2/3and of B
itis 1/3.So A does 1/14 x 2/3 i.e. 2/42 of the work and B
1/42.Hence A alone takes 21 days to complete the work ,and B
42 days.
| Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
can we find the inductance of a induction motor?
acb(AIR CIRCUIT BREAKER)NOT CHARGING AUTO
Why 3 phase induction motor getting supply in body if one of it's phase is cut
What is Faraday's law
what is electrical machines
what is feeder bay?
why we have to particulary use ACB for below ratings,even available of MCB,MCCB with that range ?
If a current -8+6sin6t is flowing three ammeter, one is a centre zero PMMC meter, one is true rms meter and one is moving iron meter. What are the reading of these three meter respectively?
hi plz send me reliance placement papers..i.e electrical technical papers that have been asked in reliance test.
What is Auto Mains Failure Panel & Auto Synchronizing Panel
What is the ratio of true power to apparent power in an ac circuit?
what is the difference between ups & inverter
what is the differance between HT motors And LT MOTORS.
what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????
at work i have a genertor/alternater what is the easyest way to work out if it is dc or ac?