A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / vaibhav kumar
28
| Is This Answer Correct ? | 8 Yes | 18 No |
Post New Answer View All Answers
what are the advantage and dis-advantage of 3 phase 4 wire energy meter?
How to select transmission line type (i.e. 11kv or 33kv) for new established industries
slipring induction motor starting time Lrs operating why lrs starting time lrs outer body didn't get shock
in general it is observed in power stations, the tertiary winding is used in higher rating Y-Y auto transformer but not in Y-Y power transformer. is the tertiary winding is compulsory then why it is not using in power transformerÂ
how can we change the phase angle b/w two phase?
Why is remote backup preferred to local backup?
my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.
what is allowable ac mixing in dc
What happen in ups if phase reverse?
Why we are use dol starter up to 10 hp
what is ratio of copper wire size and current ?
Is the installation of the filter cloths necessary before spreading the gravels at the transformer yards?
what is the formula of starting current of 3phase and 1 phase motor???
How can we find out LT UG cable fault (size,from-4*25mm sqr to 4*300mm sqr)? How mani types UG cable faults?
how did the testing of protection relays done through current injection