How to calcualte the total number of cells required for
particular UPS of some X KVA with 3 and 5 hours back-up?
Answer / maksoodazhar@gmail.com
24v×100ah= 2400 watt hr
Backup time = 2400/total load
= 2400watthr/1kva
= 2400/1000×.8
= 2400 watthr/800 watt
= 3 hr
| Is This Answer Correct ? | 1 Yes | 0 No |
can you give main difference between ELCB And RCCB?
38 Answers MCB Bank, Reliance, Wipro,
why there is no short circuit when any resistance is used between phase and neutral?
Whai isPCC and MCC Difference?
what is the order of mgnetiation current in a current transformer of 1000A/1A ratio?
what is the diffrance between earthing and grounding...?
Whether capacitor loads can be connected for testing a diesel engine at its full load capacity? Is there any limitation of capacotir load? Which is the best load for testing DG sets?
Dear, How much ph is maintained of water electrolite used in lrs for slipring induction motor ?
can we use existing 6300V alternator for generating 6600V by increasing excitation,what are advantages & disadvantages to alternator & motors of 6600V.
what will happen if u run induction motor beyond its rated speed
13 Answers Adani, BARC, Bescom,
Grid fault level [KA]?
Can we use Motor protection CB while we use the VFD for Speed control?? if not means please tell the reason!!!
how slip power recovery system work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)