How to calcualte the total number of cells required for
particular UPS of some X KVA with 3 and 5 hours back-up?
Answer / maksoodazhar@gmail.com
24v×100ah= 2400 watt hr
Backup time = 2400/total load
= 2400watthr/1kva
= 2400/1000×.8
= 2400 watthr/800 watt
= 3 hr
| Is This Answer Correct ? | 1 Yes | 0 No |
Why electricity is generated and transmitted at the values of multiples of 11?
How can Inductive load reduce the line voltage of HV transmission line and vice versa Capacitive load?
WHY WE USE CABLE JUNCTION AFTER BETWEEN TANSMISSION LINE AND TRANSFORMER
explain the existence of reactive power in electrical engg?when it generates?
what difference between thermal and bi-metal over load relay?
what is first pole to clear factor ?
In convertor can we use rectifier thyristor in place of invertor thyristor with explain.
If we give 2334 A, 540V on Primary side of 1.125 MVA step up transformer, then what will be the Secondary Current, If Secondary Voltage=11 KV?
IN MY SYSTEM THERE IS ONLY OVER CURRENT EARTH FAULT RELAY IS AVAILABLE. FOR THE UNBALANCE SENSING IS THERE ANY RELAY IS AVAILABLE? THE SAME CTs WHICH ARE USED FOR THE OVER CURRENT EARTH FAULT RELAY CAN USE FOR UNBALANCE ALSO?
can i able to get bhel previous exam question paper?
Why a transformer Noise during its running condition ?
is it possible to flow currnet between earth and nutral wire in a circuit???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)