Answer / muhammad ali
Datum line or point is a reference point for level
measurement.
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / elsayem
datum point is the rerence point when we measure level
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / imran
It is the refference point of any vessel from where zero
level start above bottom of vessel.For level measurement it
is zero level and head pressure is measured at this point.
| Is This Answer Correct ? | 1 Yes | 0 No |
How to check electrical health of Vibration probe?
why k factor is important to know in flow transmitter. if we don,t know k factor what will be issue we can face .
1 Answers Flour Tech Engineers (P) Ltd,
Difference between dcs and plc including date processing and architecture.
Explain the combusion chamber
What is the difference between modbus,fieldbus & profibus
pressure switch range 0 to 2bar.i have to install from ground level to 5 meters height.what is the formula the to increse the range ? and every 1 meter how much pressure should be add ?
what is the deferance between LCN and UCN.
define feed forward control loop with example and drawing?
You wish to SINK all my digital inputs to a PLC digital input card. Would you common out the leads to a positive or a negative connection?
what is the imbustion control loop
What is two wire system and how it work
what is the function of boiler in plant?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)