Answer / venkat.b
Hi all when v save one report in reportstudio,it does not
have any extension.just v can see the result in diff formats
(xml,pdf,html,csv...).so there is no extension 4 a report
in reportstudio.
thank you..
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / mohan potla
Hi ,
When u r saving the report studio report.means u r actually
saving the Report specification which is stored in the
form of .xml specification.
when u r viewing the report in the package is shown with
extension .crr
Thanks
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / pamir
Depends on the format on which the report is being run.
By default, I think its in .html format.
The report can be made to run in any formats like HTML,
PDF, XLS, CSV ( Comma separated format) and XML and based
on that, report can be saved in
either .html, .pdf, .xls, .csv or .xml
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / shekar
when we save save the report it save our spesifications like
u can choose(in report studio RUN MENU by cliking down
icon) HTML,XML,CSV,OR PDF Format
if u save the report HTML u can also run report defferent
format as u like or diffrent language aslo
| Is This Answer Correct ? | 0 Yes | 5 No |
what is Galaxy schema??
What is the difference between macro & Parameter
How to pass parameter value into html design page?
Can anyone tell me which automation tool is used in cognos,is it a testing tool or performance enhancing tool Thanks in advance
how can we improve performance of the reports?
we are in a trail to create a crosstab with rolling months as columns,i mean we have a crosstab with LOB as rows and loan amount as measure,coming to the main problem we have to create dynamically changing column in the columns of the crosstab.The requirement is ...we must have two dynamic columns like feb 08 and feb07.For example if current date is feb 28,we have to get the loan amount from 1st of feb to 27 of feb 2008 as feb08 and loan amount from 1st of feb to 27th of feb 2007 as feb07 columns.Please suggest us the possible way....thanks in advance....
Where do you edit cognos sql in report studio?
how do you test reports in reportnet? what do you record in unit testing documents? pls give answer in detail......
Hi I have Most updated Cognos dumps like COG-112(ReportAuthor),COG-122(Admin),COG-132(Meta Data Modeller). 100%score Gurantee. If anyone intrested mail me on kris.bi121@gmail.com
what is cardinality that you can give to employee and department query subjects in framework manager?
What are the differences between Cognos 8 and Cognos 7.x version?
How can reports be bursted based on two groups? I want to schedule to burst a report based on product line and years and I need the burst report for every product line and every year. How can this be done? Please help..