when will the position neutral axis shifted in beams
Answer Posted / anand858
when Ast is incresed
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
What is the cost difference between site mix and ready mix concrete per cubic meter
what is the painting co efficient of slope roof tiles?
what is idealized curve for concrere and steel
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How much cement will require for 1Rmt Skirting laying
TELL ME THE EQUATION FOR OGEE SPILLWAY
How to calculate volume of concrete & steel on tank foundation & ring wall ?
what is the theoritical percentage of concrete cubes testing per day?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
what is the difference between prime coat and tack coat in road construction
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance