Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


if a 3phase motor runnig in star delta starter with full
load of its,and its rated 15 amps.now we conneted over load
thermal relay at its main contactor,here what will be our
amps sittings?

Answers were Sorted based on User's Feedback



if a 3phase motor runnig in star delta starter with full load of its,and its rated 15 amps.now we ..

Answer / pillay

If star delta connection it will have 6 wires . so the amp setting of the TOR WILL BE FULLLOAD AMPS /ROOT 3
15/1.732 =8.6 AMPS

Is This Answer Correct ?    6 Yes 2 No

if a 3phase motor runnig in star delta starter with full load of its,and its rated 15 amps.now we ..

Answer / tp

15 amp

Is This Answer Correct ?    2 Yes 5 No

if a 3phase motor runnig in star delta starter with full load of its,and its rated 15 amps.now we ..

Answer / k.prakashchandra

The thermal relay is coeected to mains and not after the
starter.The setting may be at 110 to 120 % 0f full
load.i.e.16 to 18 A

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

difference between silent and non silent pole rotor?

3 Answers  


what is the principal of star delta starter?

9 Answers  


is it possible to give the total load from the supply generator's maximum in practical?

2 Answers  


how to testing the AC 3 phase motor? and what is the test procedure & kits required for testing?

3 Answers  


A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE TO FINISH THE WORK IS 1.11 2.21 3.28 4.42

3 Answers   Ramky,


name of good resistance material

1 Answers  


What is the HVDC Transmission System? What are the conditions applicable to lay an HVDC Line?

0 Answers  


What is Class and accuracy in CTs? Types of Classes and important of Classes?

2 Answers  


What is meant by power factor correction?

5 Answers   Aspire,


what r the types of transmission line?

28 Answers   DIET, RRB, WAPDA Water and Power Development Authority,


working of bulb?

1 Answers  


how i meggar value of 11kv alternator winding.and with meggar.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)