What is a purpose of slow firing before commissioning of
bagasse based boiler. and what is the water requirement for
make up?
Answer / a. nagaraja
Refractory work will be done in the boiler at the bottom
four sides, manhole doors,burner area, peephole area and at
the top of the boiler. To heat the refractory from low
temp. to high temp, slow firing is done. So that
refractory will be gripped. And also to remove the
unwanted particles like sand, rust, oil and others from
boiler tubes and headers slow firing is done.
TSP and NaoH chemicals will be added with D.M water and it
will be filled in the boiler. The prs. will raise slowly
up to max. 15kg/sq.cm
Is This Answer Correct ? | 21 Yes | 3 No |
Explain how can you convert air mass to air volume?
i want to know what r the various job in government as well as central government, for mechanical engineers. can any one answer plz
what is mean by CONCENTRICITY? how it is measure?
11 Answers Greaves, Maha Enterprises,
What is non-destructive test and what is the purpose of it?
HOW IMPURTIES IN A METAL CRYSTAL AFFECT THE PROPERTIES OF METAL PATICULARLY ELECTRICAL ONES? GIVE BASIC REASON?
A vertical plate and a horizontal plate are suspended in an open room. Both are heated to the same temperature. Which one will cool first?
why mechanical engineering in US universtiy??
What is Governor A1 & A2 for engine
Define emissivity.
Define ferrite?
what will happen if there is no expansion valve in the air conditioning system? is there any possiblities of working an AC system without expansion valve?
when eating ice cream, why the spoon of wooden material is always straight & plastic spoon is always convex in shape?