Rate analysis of 150mm, 100mm, & 230mm thk BBM work
No Answer is Posted For this Question
Be the First to Post Answer
What is the cost difference between site mix and ready mix concrete per cubic meter
How many kilo of binding wire required for one ton of reinforcemet steel binding?
17 Answers ECCI, L&T, Shri Janani Homes,
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
different types of footing. and difference between footing and foundation
what could be the production cost of 1 cum of concrete by CP30 plant
Rate analysis of painting
in the construction of building,we are use formula for laping? such that how many formulae we use? which are them?
Common strng of kg/m3 building materials
Name four load bearing elements (structural elements) in a framed building
Explain the latest method to detect a crack in a building?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
what is the advantage of electronic theodolite over transit theodolite?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)