rate analysis for shuttering 1:6
Answers were Sorted based on User's Feedback
Answer / sjtbehera
what is mean by shuttering 1:6
shuttering are measure by sqm or sqft.
anyalisis can be done by taking plywood, support ( Bolly)
and batten
| Is This Answer Correct ? | 10 Yes | 0 No |
what is the method used for marking of cantilevers in hirise buildings by using theodolite
what is diversion?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
19 Answers DNA Infrastructure, HCC, L&T,
While casting slab at what length slab casting should be stop
What is the distance between railway tracks?
Whats the meanig of ,'K' VALUE in the case of soil.....
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
0 Answers L&T, Rail Vikas Nigam Limited RVNL, RRB,
Explain how you can turn off the display for dimension in CAD?
how much thick Pcc required for floor tiles
Which concrete grade and cement/water ratio is the best?
1 Answers College School Exams Tests,
How to calculate the crank length of the rod in beam? Please give me a details.
what are the diffrent kind of grades in concrete and what does M means while specifyng the grades?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)