rate analysis for shuttering 1:6
Answers were Sorted based on User's Feedback
Answer / sjtbehera
what is mean by shuttering 1:6
shuttering are measure by sqm or sqft.
anyalisis can be done by taking plywood, support ( Bolly)
and batten
| Is This Answer Correct ? | 10 Yes | 0 No |
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what is the material consumption of 1:2:4 by kilogram?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Volume of 25kg putty bag & 40 kg putty bag volume??
What is unit weight of normal concrete?
1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?
is there any difference in footing and slab reinforcement?
what is workmanship.
What is the functional difference between DOME and R.C.C., where purpose of both covering roof?
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
how much bags of cement will be in 1 cmt of having the ratio 1:3:6
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)