Answer / sachinvom
The electrical power portion of most buildings will include
metering, switchgear and distribution panels. A
Construction Supervisor should have a basic understanding
of what these elements do. The metering allows the power
company to keep track of how much electricity gets used.
The largest amount of electricity used at one time (the
Demand) and the power factor also are important on
buildings that have more inductive loads like motors.
Then a main breaker will be required in the switchgear,
allowing the entire electrical system to be turned off.
From this main breaker, the current flows through circuit
breaker panels and sub-panels. Typically a one line diagram
shows the general concept of the electrical power system
and includes metering, switchgear and panels.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sakthivel
metering
meter is a electrical apparatus it measure the
electrical parameter just like votage ,current energy etc..
switchgear
switchgear is a main importent electrical power control
switch it working depents on voltage, current sence
apparatus
panels
panels are electrical meters and switch gear fixing
coboard with use electrical rule.
| Is This Answer Correct ? | 1 Yes | 2 No |
What are the advantages of using distance protection schemes as opposed to normal overcurrent/ earth fault protection on high voltage feeders.
Why current leads the voltage in case of capacitor load? Why voltage leads the current in case of inductive load? Why both are with in phase in case of restive load?
Why mostly GT(Generating Transformer)has only Ynd1 Vector Group?
what is prniciple of three phase IM?
Define relative stability.
is emf is indued if dc is passed through coil
Can we use delta-star neutral grounded 3 phase power transformer bi-directionally.
How will u calculate wire size according to current rating?
how to select earthing conductor size of amy motor/panel etc.
How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.
why are caluculte transformers or dg's in kva does not caluculate in kw
hello! sir i did three year of diploma in electrical (2007- 2010) and now i m a student of electrical engineering. sir can i apply for germany visa for study and part tome work over there?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)