what is quick sand
Answers were Sorted based on User's Feedback
Answer / sag
When flow takes place in an upward direction , the seepage pressure also acts in upward direction and effective pressure is reduced. If seepage pressure becomes equal to the pressure due to the submerged weight of the soil , then effective pressure reduced to zero .in such case ,a cohesionless soil loses its shear strength , and the soil particles have the tendency to move up in the direction of flow .
This phenomenon of lifting of soil particles is called as quick condition or boiling condition or quick sand
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / pranav a mudaliyar
Quicksand is a non-Newtonian fluid: when undisturbed it
often appears to be solid but a minor change in the stress
on the quicksand will cause a sudden decrease in its
viscosity. After an initial disturbance—such as a person
attempting to walk on it—the water and sand in the
quicksand separate and dense regions of sand sediment form;
it is because of the formation of these high volume
fraction regions that the viscosity of the quicksand seems
to increase suddenly. Someone stepping on it will start to
sink. To move within the quicksand, a person or object must
apply sufficient pressure on the compacted sand to re-
introduce enough water to liquefy it.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / m.saranya,tce
qucik sand condition occurs when the effective stress of
the soil is reduced to zero.At that time the gradient will
change to critical gradient Ic.
| Is This Answer Correct ? | 3 Yes | 1 No |
what is meant by GANTRY GIRDER?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
silt%= silt volume/ silt+sand volume is this right?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
0 Answers Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,
how much cement is required for 3200 sq ft of roof
How calculate the physical stock of material such as Fine/Coarse aggregate,sand & stone dust laying at site?
for what perpuse we use CBR test in road project?
what does the grad of cement shows (denotes)?
Why steel rods are produced only in even dimensions?
how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4
why do we not deduct volume of steel to find actual volume of concrete in practical???
What is the difference between EPC,DBOOT and BOOT.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)