how to do reconciliation of steel
Answer / sjtbehera
go for bar bending schedule, obtain dia wise reinforcement
also trackout what weight are come to site. then it gives
the balance avialiable at site.
this is the reconciliation of steel.
| Is This Answer Correct ? | 16 Yes | 11 No |
what is the unit of heat of hydration?
How to find out the quantity of steel FE415
16 Answers Bhel, L&T, TATA,
what are the mixing of M10,M15,M20,M25,M30grades?
how to decide cement quantity in 1 m3 concrete
plz send me civil q papers of hpcl
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
Why we do soil classification?
the construction of building in that primary thing is dig the soil which what depth will dig in stiff soil
why bent up bars in slab provided in alternate manner and not continuos ?
How many bricks are there in 100cft?
Laboratory experiments conducted in Mumbai on a particular mix showed a strength of 33 MP a for a fully matured concrete. Find whether formworm can be removed for an identical concrete placed at Jammu at the age of 15 days when the average temperature is 60C. The stripping stress in concrete
what will be price of 1:2:4pcc per kg?
0 Answers Intellect Engineers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)