Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the average hieght of a electrical tower? what are
the factors that are taken into consideration for deciding
its hieght other than voltage level?



What is the average hieght of a electrical tower? what are the factors that are taken into conside..

Answer / k.prakashchandra

30 mt.Ground clearance

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Why does curving the pole faces in a dc machine contributes to a smoother dc output voltage from it?

0 Answers  


hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.

0 Answers  


WHY WE NEED NEUTRAL FOR 3PH 400 OR 415 VOLTS POWER SUPPLY (4 WIRE SOURCE).

5 Answers  


1 ton AC takes how much current( starting & stable)

15 Answers  


How much minimum insulation required between 11kv/3.3kv transformer windings?

0 Answers   Descon,


which is more dangerous AC\DC supply

3 Answers  


If the supply voltage is same (say 440V) whether a system designed for 60 Hz frequency will work with 50 Hz frequency or not , if so pl. give clarification.

11 Answers   ABB,


whats the diff b/w mpcb and mcb?weather it trips on single phasing or not.

9 Answers   Electra Power, Essar,


how to calculate neutral current in three phase four wire system

1 Answers   Auto Meters,


How to run 1ph motor(230 VOLTS its full load amps is 4.5 ampa))with 480 volts main(we didn hav neutral)Thn we go for step down transformer.Our load 10 amps,so we conisder this amps in primary are secondary side

1 Answers  


PRV (Pressure relief valve) Trip with oil splash outside power transformers

1 Answers   Khan,


What Is HO factor in power selection

0 Answers   Wonderla Holidays,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)