What the approval that owner will give to contractor during
construction project period? What will the affect on project
if delays due approvals?
Answers were Sorted based on User's Feedback
Answer / mayank jain
1.economically losses
2.it is depend on site condition
| Is This Answer Correct ? | 1 Yes | 0 No |
1) Time loss
2) Increase the project cost
| Is This Answer Correct ? | 0 Yes | 0 No |
How many Steel used in 1 cum tower foundation
dialation means
Why stag rod provided in roof truss.
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
Define block?
how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?
How to calculate 45 degrees bend Steel bar length in Slab Reinforce ment
12 Answers JBS Builders, L&T, Rajarathnam Construction,
how to conversation of all construction material in to brass
Does vetrified tiles needs to be cure before fixing?
How to defind P.C.C. mix design according ratio & IS coad
which beam has more strength rectangular or circular
how many bricks consume for one cft with wastage
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)