Answer / sanjeev nair

The formula for calculating the Capacitive kVAr required to
compensate inductive kVAr is kW*sqrt(tan_angle1-tan_angle2).
In your case, you have to check the present power factor
and then the kW.
Suppose, If you have load of 50kW and the power factor is
0.8 and you have a plan to improve the PF to 0.95 then as
per the above formula the Capactive kVAr required to
compensate the inductive kVAr would be 21.
Besides, one should understand and work on the application.
ie, you can go for a 20 kVAr capacitor bank as per the
above if you have 50kW motor working on a pf of 0.8. If
both load and inductive kVAr is varying, then you have to
go for automatic pf control system with suitable banks to
compensate the inductive kVAr.

Is This Answer Correct ?    4 Yes 3 No

How can we calculate the capacity of the capacitor bank attached with the Main panel, when we know ..

Answer / chiknabacha

http://www.newindiaelectricals.com/newindia/exports/capacitor/calculation.htm

Please find the calculation for KVAR from the required table

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is the deference between watt and KVA

3 Answers   IAF,


This is urgent!! What is a Thyristor-based 3-ways selector switch with Zero crossing control? how does it operate and where is it mostly found in a system?

0 Answers  


how you will decide the distance between the power transformer and its fencing

0 Answers  


what is the difference between series and shunt compensation using facts in a transmission line

8 Answers   College School Exams Tests, Genco,


Define the term Capacitance and Inductance?

0 Answers  






what is the function of starter & choke in the tube light set & how choke give 1000 volts while switching on.

14 Answers   ADNOC Abu Dhabi National Oil Company, IBM,


What is the meaning of high reputuring in HRC fuse.?

1 Answers   ABB,


Can we use shunt trip coil instead of trip coil with protection relay for protection?

0 Answers  


what is the difference between Power and Distribution transformers ?

0 Answers  


1 HP = how many Kva

5 Answers  


What happen if field ckt is open when a sailent pole alternator connected to infinite bus

3 Answers   Bhel, Nilkamal,


What is the role of Dedicated earthing in UPS System?

0 Answers   HCL, MSPL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)