How is rate analysis prepared for M 25 grade of concrete?

Answer Posted / g pavan kumar

calculate the coarse aggreate+cement+quality
expensis+considered traveling charges+electric power
charge+technical persons charge+shurtring+curing cost and
additional mixing cost.

Is This Answer Correct ?    11 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate rate analysys of 1:6 plastering 10 sq m

2500


How do we calculate the power of centrifugal pump?

684


What glue is least sticky?

682


How do we determine the specific gravity of a cement?

645


Describe Briefly The Various Methods Of Concrete Curing?

663






What is the yield of 100 litres of water and 10 kg of cement in grout mix?

1574


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

1889


What do you mean by tolerance factor of concrete ?

2666


what is the meaning of degreasing of the euipment or line.

3303


Describe the sections included in a typical bill of quantities

1782


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1487


Minimum concrete cover in slabs, columns, beams, foundation and other st?

665


How to find the cuplock pipe qty in staging for Minor bridge?

681


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1939


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

1689