How is rate analysis prepared for M 25 grade of concrete?
Answer Posted / pranav
Calculate the quantity of coarse aggregate + sand +cement +
method of placement + shuttering + method of curing
| Is This Answer Correct ? | 83 Yes | 12 No |
Post New Answer View All Answers
pls mail some more tecnical qustions at msaranya2610@gmail.com
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
2. What are the advantages of your present job, things you like about it?
What is alternate bid?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What are the joints wants to made in masonry where door opening, arches like etc..
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Does VDF add strength to the flooring apart from preventing water ingress?
Which percentage of carpet area use in plot area of office building.
What is passive earth pressure ?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
How to determine thee cut length for steel reinforcement bars in R.C.C design
What things you need to take care of before building a kitchen island?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?