How is rate analysis prepared for M 25 grade of concrete?
Answer Posted / simarpreet upweja
Total Cost will be Material cost + Labour cost + Mode of pouring + mode of mixing and transit + Shuttering Cost + Curing cost in later stage
Material cost will include cost of water + Recron(any fiber if adding) + admixer + coarse aggegate + fine aggregate + sand + Cement + Flyash (if using crush sand).
There are many ways of mixing.
i) If using batching plant then cost of transit millers and plant.
ii) If mixing is done at site by mixer then there will be no cost of transit.
iii) If mixing is done manually then it will be covered under labour cost.
Labour Cost : Self Explanatory
Shuttering Cost : As per surface area multiplied by cost per unit area.
Curing Cost : Self explanatory. Curing can be done by many ways so first you will have to decide method.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Moisture content calculation for diff mix ratio's ??
what would be the design load of R.C.C Cooling tower per cell.?
Explain different types of rcc pipes.
five benefits of using standard terminology in the measurement process
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
What is the zero value in quantity surveying
how do we design mix ratio?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
How many pyramid in egypt?
3. What are the disadvantages of your present job, things you do not like about it?
how to calculate total cost for slab 35'×8'
How do you calculate the unit weight of concrete?