Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the cement and sand content in the mortar used to
build 1 sqm of 190x190x390mm hollow and solid blockworks?

Answers were Sorted based on User's Feedback



What is the cement and sand content in the mortar used to build 1 sqm of 190x190x390mm hollow and ..

Answer / suresh

1 bag cement required for 60 blocks.cm 1;5

Is This Answer Correct ?    0 Yes 0 No

What is the cement and sand content in the mortar used to build 1 sqm of 190x190x390mm hollow and ..

Answer / pawan yadav

30kg cement using or 180kg stone dust using in block working.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?

1 Answers  


Which stone is best for wall construction Laterite Stone or Cement Blocks

0 Answers  


calculate if the size of the beam is 300*500 then L for the top & bottom bar

2 Answers   ACPL,


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

0 Answers  


Difine coffer dam ?

1 Answers  


A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?

6 Answers  


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

0 Answers  


How to calculate the load of partion in flat slab if we use brick?

0 Answers   CE, Mahalaxmi Developers,


What tor stands for in tor steel?

0 Answers  


how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???

3 Answers  


What is zoning permit?

0 Answers  


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)