What is the cement and sand content in the mortar used to
build 1 sqm of 190x190x390mm hollow and solid blockworks?
Answers were Sorted based on User's Feedback
Answer / pawan yadav
30kg cement using or 180kg stone dust using in block working.
Is This Answer Correct ? | 0 Yes | 0 No |
What is grouting? Why it is done?
What is pre-stressed concrete?
how many brick sand cement require (1:5) 1 cum
howto calculate the quantities of material used in fly ash brick after finding the volume??
How much do you want salary?
in m25 concrete what is m.
How many types of rcc slab
what is BOQ? BOQ IS US IN ESTIMATE
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
Test procedure of fly ash bricks as per code ?
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
How much for the BRC lapping in full yield and half yield < and which table to get it ?