What is the cement and sand content in the mortar used to
build 1 sqm of 190x190x390mm hollow and solid blockworks?
Answer Posted / pawan yadav
30kg cement using or 180kg stone dust using in block working.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
difference between fc and fc'?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Whats the meanig of ,'K' VALUE in the case of soil.....
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
what is the anchorage length of reinforcement.
punj loyed and sapurjl palanjl
How to fix toll charge for a particular vehicle at toll booths in a highway?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
What will you do if a portion of load bearing wall collapses under your supervision?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
what's the formula for calculate pcc for matt(45mm aggregate)?